KEY PROJECTS
TOTALENERGIES | DEC 2024 – PRESENT
QC WELDING / NDT INSPECTOR
PROJECT: MOZAMBIQUE LNG GAS DEVELOPMENT PROJECT
CONTRACTOR: TECHNIPFMC | LOCATION: EGYPT
​
-
Overseeing welding and NDT inspection activities for subsea and onshore LNG facilities in compliance with TotalEnergies and TechnipFMC quality standards.
-
Ensuring adherence to project specifications, ITPs, and international codes for fabrication, testing, and quality assurance of critical components.
-
Supporting development and quality control of pipelines, subsea systems, and LNG processing infrastructure under the Anadarko Mozambique Area 1 (AMA1) field development.
-
Contributing to TotalEnergies’ flagship LNG expansion by ensuring the integrity, safety, and reliability of welding and NDT operations within multi-disciplinary teams.

SAIPEM S.P.A. KUWAIT BRANCH | FEB 2019 – DEC 2024
SENIOR QA/QC ENGINEER | CLIENT: KIPIC | LOCATION: KUWAIT
PROJECT: KOC FEED PIPELINES FOR NEW REFINERY PROJECT (ZOUR REFINERY)
​
-
Directed QA/QC activities for fabrication, welding, and NDT across crude feed, fuel gas, and product transfer pipelines supporting KIPIC’s Zour Refinery.
-
Reviewed and approved critical project documentation including WPS/PQR, ITPs, NDT procedures, fabrication drawings, and NCR/CAR reports.
-
Supervised welding, PWHT, visual inspections, and welder qualification testing to ensure compliance with project and international standards.
-
Monitored NDT operations (RT, PT, MT, UT), performed radiographic interpretation, and managed isometric control for weld identification and modifications.
-
Oversaw hydrostatic, pneumatic, vacuum box, leakage, and hardness testing ensuring mechanical integrity and system compliance.
-
Conducted material inspections for piping, plates, fittings, and structural steel ensuring conformity with project specifications.
-
Supervised wrapping, steam tracing, and insulation inspections for underground and heat-traced piping systems.​

WOOD EGYPT | AUG 2018 – JAN 2019
PMC SENIOR QA/QC WELDING ENGINEER
PROJECT: MIDOR REFINERY EXPANSION PROJECT
LOCATION: ALEXANDRIA, EGYPT
​
-
Supervised and managed all on-site QA/QC activities for piping and welding works within the refinery expansion scope.
-
Oversaw welding, NDT, PWHT, verification, and testing operations ensuring compliance with project specifications and international standards.
-
Conducted system walk-downs for piping test packages and subsystems to verify mechanical completion.
-
Witnessed pressure and leak testing of piping systems ensuring safety and integrity.
-
Reviewed and validated construction and quality documentation to ensure full PMC compliance and traceability.

DNV GL EGYPT | JAN 2018 – JUL 2018
SENIOR PIPING INSPECTION ENGINEER /
THIRD-PARTY INSPECTION ENGINEER (TPI)
PROJECT: EGYPTIAN REFINING COMPANY (ERC)
CONTRACTOR: GS ENGINEERING, KOREA | LOCATION: CAIRO, EGYPT
​
-
Executed third-party inspection and quality surveillance for piping fabrication, welding, and installation activities under ERC refinery standards.
-
Monitored NDT and PWHT processes ensuring adherence to project specifications and international codes.
-
Conducted site inspections, verification, and testing of piping systems to validate mechanical and quality compliance.
-
Performed walk-downs for piping test packages and subsystems prior to commissioning.
-
Reviewed and approved construction, inspection, and quality documentation ensuring full compliance with DNV GL and client requirements.

KIPIC / AMEC FOSTER WHEELER (OFFSHORE)
AUG 2017 – DEC 2017 | LOCATION: AL-ZOUR, KUWAIT
PMC PIPELINE LAYDOWN ENGINEER (PROJECT MANAGEMENT CONSULTANT)
PROJECT: AL-ZOUR REFINERY PROJECT – SUBSEA PIPELINES INSTALLATION (UNIT 93)
​
-
Served as PMC representative overseeing offshore pipeline laydown and subsea installation activities for KIPIC’s world-class Al-Zour Refinery Project.
-
Supervised pipeline routing, laying operations, and offshore tie-ins ensuring compliance with project specifications and marine construction standards.
-
Coordinated with EPC contractors and marine teams to ensure safe and precise installation of subsea pipelines from shore to Sea Island terminal.
-
Monitored offshore construction progress, alignment control, and QA/QC compliance for subsea and onshore interface sections.
-
Contributed to the successful installation of marine pipelines supplying liquid products to a Sea Island facility 17.5 km offshore at a depth of 20 meters.

SAIPEM GEORGIA BRANCH | JUL 2016 – JUL 2017
MECHANICAL QC SUPERVISOR
PROJECT: SOUTH CAUCASUS PIPELINE EXPANSION (SCPX) PROJECT
CLIENT: BP (BRITISH PETROLEUM) | LOCATION: GEORGIA & AZERBAIJAN
​
-
Supervised and coordinated pipeline hydrotesting and pre-commissioning activities across multiple sites in Georgia and Azerbaijan for BP’s SCPX project.
-
Developed and implemented detailed hydrostatic testing plans ensuring full compliance with project and safety standards.
-
Oversaw key pre-commissioning operations including pipeline cleaning, gauging, hydrotesting, dewatering, and drying to ensure system integrity and readiness.
-
Conducted water source identification and quality evaluation for hydrotest operations to meet project criteria.
-
Supervised calliper surveys and geometry verification to confirm pipeline ovality, integrity, and mechanical strength.

ERSAI CASPIAN CONTRACTOR LLC | JUL 2015 – JUN 2016
WELDING QC SUPERVISOR
PROJECT: KASHAGAN 2 PIPELINE INSTALLATION PROJECT
CLIENT: NCOC (NORTH CASPIAN OPERATING COMPANY) | LOCATION: KAZAKHSTAN
​
-
Supervised welding and quality control activities for onshore and offshore pipeline systems within the Kashagan Phase 2 development, ensuring full compliance with ISO and contractual QA standards.
-
Planned and executed project-specific Quality Assurance and Quality Control Plans covering fabrication, installation, and EPCI phases.
-
Coordinated with client representatives, engineering teams (Italy, France), and site personnel to align inspection and testing programs with project requirements.
-
Evaluated subcontractor QC plans, initiated corrective actions, and ensured timely closure of Non-Conformance Reports (NCRs) and Corrective Action Requests (CARs).
-
Led inspection, documentation, and quality surveillance activities for welding and material integrity across 95 km of oil and gas pipelines.

SAIPEM MISR FOR PETROLEUM SERVICES | SEP 2011 – JUN 2015
PROJECT QUALITY ENGINEER
PROJECTS: WEST DELTA DEEP MARINE (WDDM) PHASE 8B DEVELOPMENT & PHASE 9A FEED
CLIENT: BURULLUS GAS COMPANY | LOCATION: PETROJET FABRICATION YARD, MAADIA – ALEXANDRIA, EGYPT
​
-
Directed project quality management activities from tender to as-built completion for subsea and offshore pipeline development under the WDDM projects.
-
Prepared and implemented Quality Plans, Quality Control Plans, and Project Quality Procedures ensuring full compliance with ISO and contractual standards.
-
Liaised with client representatives and international engineering teams (Cairo, Italy, France) to align inspection, testing, and documentation requirements.
-
Evaluated and approved vendor and subcontractor quality systems, ensuring suitability and adherence to project specifications.
-
Monitored and verified site QA/QC operations including inspection, fabrication, welding, and testing at fabrication yards and offshore sites.​

AL JABER & PARTNERS | JUN 2011 – AUG 2011
THIRD-PARTY INSPECTION ENGINEER
PROJECT: PEARL GTL (GAS-TO-LIQUIDS) PROJECT
CLIENT: SHELL | LOCATION: RAS LAFFAN CITY, QATAR
​
-
Conducted third-party inspection and radiographic interpretation for over 5,000 welded joints of varying diameters and thicknesses on Shell’s Pearl GTL Project.
-
Ensured welding and inspection activities met project specifications, international codes, and Shell QA/QC requirements.
-
Verified weld integrity, documentation accuracy, and NDT compliance for final approval and certification
PROJECT SERVICES COMPANY | SEP 2007 – MAY 2011
QUALITY CONTROL HEAD
LOCATION: EGYPT
​
-
Managed all QA/QC operations for multiple fabrication and construction projects involving pressure vessels, steel structures, and piping systems across power, oil & gas, and wastewater sectors.
-
Developed and implemented quality procedures, inspection plans, and test documentation in line with ASME, AWS, and NBIC codes.
-
Supervised welding, fabrication, and NDT activities ensuring conformance with project standards and international codes.
-
Coordinated with clients, consultants, and third-party inspectors for quality audits, approvals, and system verifications.
​
KEY PROJECTS:
-
Waste Heat Recovery Project (WDDM Phase VIIIa) – EMC / ELNG | Code: AWS D1.1 (2010)
-
Steam Drum Alteration Project (Unit No. 1351) – AMOC | Code: NBIC Part 3 (2007/2009), ASME VIII Div.1
-
Pressure Vessels Fabrication – IOS / Halliburton | Code: ASME VIII Div.1 (U Stamp)
-
Abu Qir Thermal Power Plant Units 6 & 7 – Ansaldo Caldaie / PGESCO | Code: ASME VIII Div.1 (U Stamp)
-
Alexandria East Wastewater Treatment Plant (EWTP) – Degremont / CAPW | Code: AWS D1.1 (2008)
-
El Tebbin Thermal Power Plant (Boiler External Piping) – Ansaldo Caldaie / PGESCO | Code: ASME B31.1
-
El Sewedy Cement Company (ESCC) – Airoil Flaregas | Code: AWS D1.1 (2006)
-
Flare Stack Project – Arab Steel Fabrication | Code: AWS D1.1 (2006)
-
UDHE PDH & PP Project (EPPC) – UDHE | Code: AWS D1.1 (2006)